Skip to content

Work management

One task. Every surface.

Board, list, mindmap, calendar, and roadmap share one record.

Already have a workspace? Sign in. New organizations register when self-serve is on; otherwise an administrator sends an invite.

See the product

The same backlog. Click through it.

Board, list, mindmap, roadmap, and reports. Sample data — not a customer screenshot.

The same task on board, list, mindmap, roadmap, and reports.

The split

One piece of work. Scattered copies.

The same item shows up in a sheet, a board, a slide, a wiki, a PR — and wherever else a half-truth landed. Status theater, nesting theater, docs that leave the work. No single source of truth.

Same key. Different incomplete truths.

Sheet rows
TASK-101

Owner: — · Status: TBD · %: 40

Sticky
TASK-101

Done? Ask Alex.

Tracker
TASK-101

In progress

Assignee blank · sprint drifted

Spreadsheet
TASK-101
Due 8 Sep64%
Board

Doing

TASK-101

Blocked? · stale

Slides
TASK-101

On track · week of 6 Sep

Slide says green. Board disagrees.

Wiki
TASK-101

Upgrade guide — see wiki

Truth left the item.

Git tab
TASK-101

harbor/platform #842

PR open · status unknown

Chat
TASK-101

“Is this still blocked or did we ship?”

Thread · 14 replies · no owner

Email
TASK-101

Re: status for leadership

Fwd chain · due “this week”

Calendar
TASK-101

Sync: “what’s the real status?”

Tue 10:00 · recurring

Notes
TASK-101

Parking lot — revisit?

Private note · not on the item

  • Status theaterThe slide is green. The board is stuck. The meeting rebuilds the week.
  • Nesting theaterParents anyone can invent. Depth that looks like structure.
  • Docs that leftThe guide lives elsewhere. The item only says “see the wiki.”
  • Tool copiesEach surface invents its own version of the plan.

In practice

See, plan, and stay on the item.

Each beat is something a team can do without opening a second tool.

See

The nest, without flattening the backlog.

Three subtask levels under a root. A fourth is refused.

Plan

Dates live on the work.

Roadmap bars and sprints are the same tasks — not a slide for leadership.

Configure

The project sets how work looks and moves.

Fields, statuses, workflow, and the card sit in one hub.

Collaborate

Comments and knowledge stay on the item.

Mentions, the project tree, and live fields stay where the work is.

Put the next cycle on one set of tasks.

Get started if self-serve is on, or ask an administrator for an invite. Sign in if the workspace already exists.